Alex, I get the following error during build from an imported database:-
Error: Can't handle date: at GT/Date.pm line 483.
The error occurred after about 45 Categories and 250 links had built. The database builds fine on 1.13.
The database imported fine (3600+ categories 36000+ links) user defined fields built okay and data imported.
Error: Can't handle date: at GT/Date.pm line 483.
The error occurred after about 45 Categories and 250 links had built. The database builds fine on 1.13.
The database imported fine (3600+ categories 36000+ links) user defined fields built okay and data imported.