
bje at serendipity
Jan 2, 2006, 1:38 AM
Post #1 of 2
(3322 views)
Permalink
|
|
%MLOAD-2-NOCPU: CPU-1 isn't running. Check ROMMON version.
|
|
Hi, I am trying to test the c7200-i12s-mz.123-14.YM5.bin image on one of my 7206 NPE-G1 LNSs to enable the second CPU for L2TP tunnel termination. However, I am getting the following error message showing up in a 'sh log': %MLOAD-2-NOCPU: CPU-1 isn't running. Check ROMMON version. I've checked CCO Output Interpreter and got "No information on error code MLOAD-2-NOCPU". I know that it's possible to upgrade the ROMMON code on a NPE-G1 - what is the recommended version to upgrade to (for this image to enable the second CPU), and any pointers to the upgrade process will be appreciated. Also, I see that this image is only a few weeks old - what version of code is everyone else running in the field at the moment, and how many L2TP tunnels do you manage to terminate on your NPE-G1's? -- clns3-rba#sho run | i boot boot-start-marker boot system disk2:c7200-i12s-mz.123-14.YM5.bin boot bootldr disk2:c7200-kboot-mz.123-14.YM5.bin boot-end-marker -- -- clns3-rba#sho ver Cisco IOS Software, 7200 Software (C7200-I12S-M), Version 12.3(14)YM5, RELEASE SOFTWARE (fc1) Technical Support: http://www.cisco.com/techsupport Copyright (c) 1986-2005 by Cisco Systems, Inc. Compiled Tue 13-Dec-05 18:35 by kehsiao ROM: System Bootstrap, Version 12.3(4r)T1, RELEASE SOFTWARE (fc1) BOOTLDR: Cisco IOS Software, 7200 Software (C7200-KBOOT-M), Version 12.3(14)YM5, RELEASE SOFTWARE (fc1) clns3-rba uptime is 1 day, 21 hours, 14 minutes System returned to ROM by reload at 13:42:10 SAT Sat Dec 31 2005 System restarted at 13:44:38 SAT Sat Dec 31 2005 System image file is "disk2:c7200-i12s-mz.123-14.YM5.bin" Last reload reason: Reload Command Cisco 7206VXR (NPE-G1) processor (revision A) with 983040K/65536K bytes of memory. Processor board ID 30509059 SB-1 CPU at 700MHz, Implementation 1025, Rev 0.2, 512KB L2 Cache 6 slot VXR midplane, Version 2.7 Last reset from power-on PCI bus mb1 (Slots 1, 3 and 5) has a capacity of 600 bandwidth points. Current configuration on bus mb1 has a total of 300 bandwidth points. This configuration is within the PCI bus capacity and is supported. PCI bus mb2 (Slots 2, 4 and 6) has a capacity of 600 bandwidth points. Current configuration on bus mb2 has a total of 300 bandwidth points. This configuration is within the PCI bus capacity and is supported. Please refer to the following document "Cisco 7200 Series Port Adaptor Hardware Configuration Guidelines" on CCO <www.cisco.com>, for c7200 bandwidth points oversubscription/usage guidelines. 3 Gigabit Ethernet interfaces 2 ATM interfaces 509K bytes of NVRAM. 125184K bytes of ATA PCMCIA card at slot 2 (Sector size 512 bytes). 16384K bytes of Flash internal SIMM (Sector size 256K). Configuration register is 0x2002 clns3-rba# -- -- clns3-rba#sho log Syslog logging: enabled (11 messages dropped, 9 messages rate-limited, 0 flushes, 0 overruns, xml disabled, filtering disabled) Console logging: disabled Monitor logging: level debugging, 0 messages logged, xml disabled, filtering disabled Buffer logging: level debugging, 34 messages logged, xml disabled, filtering disabled Logging Exception size (8192 bytes) Count and timestamp logging messages: disabled No active filter modules. Trap logging: level informational, 37 message lines logged Log Buffer (8192 bytes): *Dec 31 11:44:53.155: %LINK-3-UPDOWN: Interface GigabitEthernet0/1, changed state to up *Dec 31 11:44:53.155: %LINK-3-UPDOWN: Interface GigabitEthernet0/2, changed state to up *Dec 31 11:44:53.155: %LINK-3-UPDOWN: Interface GigabitEthernet0/3, changed state to up *Dec 31 11:44:53.155: %LINEPROTO-5-UPDOWN: Line protocol on Interface VoIP-Null0, changed state to up *Dec 31 13:44:53.475 SAT: %SYS-6-CLOCKUPDATE: System clock has been updated from 11:44:53 UTC Sat Dec 31 2005 to 13:44:53 SAT Sat Dec 31 2005, configured from console by console. *Dec 31 13:44:53.551 SAT: %MPF-4-IGNOREDFEATURES: Interface Gi0/1: Input "NetFlow" configurations are not MPF supported and are IGNORED. *Dec 31 13:44:54.155 SAT: %MPF-4-IGNOREDFEATURES: Interface Vt1: Input "NetFlow" configurations are not MPF supported and are IGNORED. *Dec 31 13:44:54.155 SAT: %MPF-4-IGNOREDFEATURES: Interface Vt1: Input "NetFlow" configurations are not MPF supported and are IGNORED. *Dec 31 13:44:54.155 SAT: %MPF-4-IGNOREDFEATURES: Interface Gi0/1: Input "NetFlow" configurations are not MPF supported and are IGNORED. *Dec 31 13:44:54.155 SAT: %MPF-4-IGNOREDFEATURES: Interface Vt1: Input "NetFlow" configurations are not MPF supported and are IGNORED. *Dec 31 13:44:54.155 SAT: %MPF-4-IGNOREDFEATURES: Interface Vt1: Input "NetFlow" configurations are not MPF supported and are IGNORED. *Dec 31 13:44:54.251 SAT: %SYS-5-CONFIG_I: Configured from memory by console *Dec 31 11:44:54.279: %MLOAD-2-NOCPU: CPU-1 isn't running. Check ROMMON version. *Dec 31 13:44:54.279 SAT: %MLOAD-3-BADVERSION: URL tar:/system/mpf/mpf_ucode_bndl/ff.bin major version -1 mismatch with IOS version 1. *Dec 31 13:44:54.283 SAT: %LINEPROTO-5-UPDOWN: Line protocol on Interface GigabitEthernet0/1, changed state to up *Dec 31 13:44:54.283 SAT: %LINEPROTO-5-UPDOWN: Line protocol on Interface GigabitEthernet0/2, changed state to down *Dec 31 13:44:54.283 SAT: %LINEPROTO-5-UPDOWN: Line protocol on Interface GigabitEthernet0/3, changed state to down *Dec 31 13:44:54.607 SAT: %SYS-5-RESTART: System restarted -- Cisco IOS Software, 7200 Software (C7200-I12S-M), Version 12.3(14)YM5, RELEASE SOFTWARE (fc1) Technical Support: http://www.cisco.com/techsupport Copyright (c) 1986-2005 by Cisco Systems, Inc. Compiled Tue 13-Dec-05 18:35 by kehsiao *Dec 31 13:44:54.647 SAT: %ENTITY_ALARM-6-INFO: ASSERT INFO Gi0/2 Physical Port Administrative State Down *Dec 31 13:44:54.647 SAT: %ENTITY_ALARM-6-INFO: ASSERT CRITICAL GBIC Slot 0/3 GBIC is missing *Dec 31 13:44:54.647 SAT: %ENTITY_ALARM-6-INFO: ASSERT INFO Gi0/3 Physical Port Administrative State Down *Dec 31 13:44:54.859 SAT: %LINEPROTO-5-UPDOWN: Line protocol on Interface Loopback0, changed state to up *Dec 31 13:44:54.987 SAT: %ENTITY_ALARM-6-INFO: ASSERT INFO AT5/0 Physical Port Administrative State Down *Dec 31 13:44:54.987 SAT: %ENTITY_ALARM-6-INFO: ASSERT INFO AT6/0 Physical Port Administrative State Down *Dec 31 13:44:54.987 SAT: %SNMP-5-COLDSTART: SNMP agent on host clns3-rba is undergoing a cold start *Dec 31 13:44:55.531 SAT: %SYS-6-BOOTTIME: Time taken to reboot after reload = 167 seconds *Dec 31 13:44:56.079 SAT: %LINK-5-CHANGED: Interface GigabitEthernet0/2, changed state to administratively down *Dec 31 13:44:56.079 SAT: %LINK-5-CHANGED: Interface GigabitEthernet0/3, changed state to administratively down *Dec 31 13:44:56.139 SAT: %LINK-5-CHANGED: Interface ATM5/0, changed state to administratively down *Dec 31 13:44:56.151 SAT: %LINK-5-CHANGED: Interface ATM6/0, changed state to administratively down *Dec 31 13:44:57.139 SAT: %LINEPROTO-5-UPDOWN: Line protocol on Interface ATM5/0, changed state to down *Dec 31 13:44:57.151 SAT: %LINEPROTO-5-UPDOWN: Line protocol on Interface ATM6/0, changed state to down -- regards, Jaco -- bje [at] serendipity _______________________________________________ cisco-nas mailing list cisco-nas [at] puck https://puck.nether.net/mailman/listinfo/cisco-nas
|